F4 Environmental application in a water environment. The results unprecedented in our Industry.
![](https://f4environmental.ca/wp-content/uploads/2019/01/sample-gathering-1024x768.jpg)
Prior to application of the the F4 Environmental technology. There is a thick layer of crude oil on the surface and all the surrounding vegetation has been killed off.
![](https://f4environmental.ca/wp-content/uploads/2019/01/90-days-insitu-1024x768.jpg)
90 days later the F4 application has remediated the crude oil and bitumen. The vegetation has come back strong and the water is clearing nicely.
THE DATA SPEAKS FOR ITSELF:
Rainbow Lake, BC: Sump Statistics
![](https://f4environmental.ca/wp-content/uploads/2019/01/RAINBOW-LAKE-TABLE-1024x666.jpg)